Thursday, April 7, 2011

Siding and Septic

We've been busy, so these updates are getting slower and slower, but we got our septic system installed. While we don't have the water to flush a toilet, it now has a place to go. Also, the new siding has arrived and they have two sides done.
The septic system is in. They had to dig three long trenches.

Our blue house - the east side of the house is now sided.

The north side is sided as well.

No comments:

Post a Comment